Vesgantti 108" U Shaped Sectional Couch, Deep Seat Cloud Modular Sectional Sofa by Vesgantti

Vesgantti 108" U Shaped Sectional Couch, Deep Seat Cloud Modular Sectional Sofa

$1,154.98
Skip to product information
Vesgantti 108" U Shaped Sectional Couch, Deep Seat Cloud Modular Sectional Sofa by Vesgantti

Vesgantti 108" U Shaped Sectional Couch, Deep Seat Cloud Modular Sectional Sofa

$1,154.98
Shipping calculated at checkout.

Product Overview

For everyday kids rooms, the Vesgantti 108" U Shaped Sectional Couch, Deep Seat Cloud Modular Sectional Sofa with 2 Ottoman, Modern Chenille Cloud Sofa Height Adjustable for Living Room, Bedroom and Apartment, Blue balances long-lasting build with modern style. measuring 60"D x 108"W x 35.5"H, weighing 1250 Pounds, available in Chenille - Blue. Notable features include cloud couch and couch delivers, contributing to its durable character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modern sofa offers unmatched flexibility, with an overall size of 108"W x 60"D x 35.5"H and seating for 2–4 people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this comfy couch
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this living room couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This cloud sectional couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This U-shaped couch will be delivered in 3 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 108" U Shaped Sectional Couch

Choose the Vesgantti 108" U Shaped Sectional Couch, Deep Seat Cloud Modular Sectional Sofa with 2 Ottoman, Modern Chenille Cloud Sofa Height Adjustable for Living Room, Bedroom and Apartment, Blue for its multi-functional approach to sofas & couches essentials: cloud couch delivers space optimization in daily use.

Best For

The Vesgantti 108" U Shaped Sectional Couch is best suited for: stretching out or curling up, all body types.

Quick Summary

The Vesgantti 108" U Shaped Sectional Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 26 inches. Weight Limit: 1250 Pounds. Seating Capacity: 5. Price: $1154.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 26 inches
Weight Limit 1250 Pounds
Seating Capacity 5
Product Dimensions 60"D x 108"W x 35.5"H
Item Weight 35 Kilograms
Type Sectional
Color Chenille - Blue
Style Modern

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like