Vesgantti 114" Boneless Modular Sectional Sofa, Modern 3 Seater Couch by Vesgantti

Vesgantti 114" Boneless Modular Sectional Sofa, Modern 3 Seater Couch

$643.48
Skip to product information
Vesgantti 114" Boneless Modular Sectional Sofa, Modern 3 Seater Couch by Vesgantti

Vesgantti 114" Boneless Modular Sectional Sofa, Modern 3 Seater Couch

$643.48
Shipping calculated at checkout.

Product Overview

The Vesgantti 114" Boneless Modular Sectional Sofa, Modern 3 Seater Couch with Ottoman & Deep Seat, Convertible Chenille L Shaped Cloud Couches for Living Room, No Assembly Required, Beige offers what living rooms demands: durable reliability and everyday usability. measuring 39.4"D x 114"W x 31.5"H, weighing 2200 Pounds, available in Beige. Notable features include flexible modular and modular design, contributing to its minimalist character.

Key Features

  • Flexible Modular Design: The L-shaped sectional sofa has 4 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
  • Spacious & Comfortable: The 114 inch modular sofa features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional couch can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
  • Durable and Long-lasting Support: This modern sofa is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
  • Premium Chenille Fabric: The modular sectional sofa is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • No Assembly Required: No tools or complicated setup are required. Our modular couch is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless sofa is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us

Why Choose the Vesgantti 114" Boneless Modular Sectional Sofa

Consistently chosen by sofas & couches buyers, the Vesgantti 114" Boneless Modular Sectional Sofa, Modern 3 Seater Couch with Ottoman & Deep Seat, Convertible Chenille L Shaped Cloud Couches for Living Room, No Assembly Required, Beige delivers sleek construction alongside flexible modular for reliable long-term durability.

Best For

The Vesgantti 114" Boneless Modular Sectional Sofa is best suited for: a living room, daily use.

Quick Summary

The Vesgantti 114" Boneless Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 29.5 inches. Seat Height: 17.7 Inches. Weight Limit: 2200 Pounds. Price: $643.48.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 29.5 inches
Seat Height 17.7 Inches
Weight Limit 2200 Pounds
Seating Capacity 4.0
Product Dimensions 39.4"D x 114"W x 31.5"H
Item Weight 61 Pounds
Type Sectional
Color Beige

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like